Home
1   2   3   4   5   6   7  
<<< >>>
d6 (62K)

The planters, log and ramp have been moved since this picture was taken. This entire area will get a load of gravel to grade away from the building. The section along the building is porous drain pipe, surrounded with a 'sock', to help drain excess moisture when it 'really' rains.